You are here: Home » News » Product News » Bird Spike Installation steps

Bird Spike Installation steps

Views:39     Author:Site Editor     Publish Time: 2018-04-09      Origin:Site

Bird Spike Installation steps

Step 1

Be sure that the area is clean, dry and free from bird droppings.

图片1.png


Step 2

Choose the tools you plan to use according to the base condition: If using on a wooden or concrete surface, simply use the screw.

If using on a plastic surface, the spikes can be fixed in place with glue, plastic ties, or

installation clamp.

QQ图片20180409102942.png


Step 3

The first row of spikes are pasted on the front of the surface, so that it is fully protected by the spikes.

PC-41拼图.jpg


Step 4

Immediately replace the damaged spike before the birds move in.


Featured Products

CONTACT US

  No.95 QiLian Street, Shijiazhuang, Hebei province, China
  +86-311-89871588
  +86-18903390899
   info@hbcrownwealth.com

Copyright  2020 Hebei Sincerity Building Hardware Products Co., Ltd. 

Contact Us/ Site Map